Acquisition Management Policy
The Acquisition Management Policy document is listed in sections. Click a section title to view/download that section, or download the complete Acquisition Management Policy document.
| Title | Revised |
|---|---|
| Table of Contents | |
| Table of Contents | |
| 1 : Overview and Key Elements | |
| 1.1 : Overview | |
| 1.1.1 : Purpose | 10/2007 |
| 1.1.2 : Scope and Structure | 4/2013 |
| 1.1.3 : Legal Basis for the Policy | 1/2012 |
| 1.1.4 : Applicability | 4/2013 |
| 1.1.5 : FAA Lifecycle Management Process | 4/2013 |
| 1.2 : Key Elements of Acquisition Management | |
| 1.2.1 : Strategic Planning, Management, and Budgeting | 1/2014 |
| 1.2.2 : FAA Enterprise Architecture | 4/2013 |
| 1.2.3 : Service Management | 7/2013 |
| 1.2.4 : Portfolio Management | 4/2013 |
| 1.2.4.1 : Agency-Wide Portfolio Management | 4/2013 |
| 1.2.4.1.1 : Portfolio Management Governance | 4/2013 |
| 1.2.4.1.2 : Portfolio Management Criteria | 4/2013 |
| 1.2.4.2 : Operational Capability Portfolios | 4/2013 |
| 1.2.5 : Acquisition Categories | 4/2013 |
| 1.2.6 : Lifecycle Management Decision-Making | 7/2013 |
| 1.2.7 : Acquisition Quarterly Program Reviews | 4/2013 |
| 1.2.8 : TechStat Reviews | 4/2013 |
| 1.2.9 : Cost Accounting | 4/2013 |
| 1.2.10 : Workforce Development and Qualification | 4/2013 |
| 1.2.11 : Continuous Improvement | 7/2010 |
| 1.2.12 : On-line Policy and Guidance | 1/2012 |
| 1.2.13 : AMS Change Management | 1/2012 |
| 1.2.14 : Legal Coordination | 7/2006 |
| 1.2.15 : AMS Lifecycle Management Documentation | 1/2014 |
| 1.2.16 : OMB Budget Documentation | 4/2013 |
| 1.2.17 : National Acquisition Evaluation Program | 7/2007 |
| 1.2.18 : Earned Value and Baseline Management | 7/2013 |
| 2 : Lifecycle Acquisition Management Policy | |
| 2.1 : Overview | 4/2013 |
| 2.1 : Overview | 4/2013 |
| 2.1.1 : Key Elements of Lifecycle Management Policy | 4/2013 |
| 2.1.2 : Evolutionary Product Development | 4/2013 |
| 2.1.3 : Knowledge-Based Decision-Making | 4/2013 |
| 2.1.4 : Standard Program Milestones | 11/2009 |
| 2.1.5 : Standard Lifecycle Work Breakdown Structure | 4/2013 |
| 2.1.6 : Measurement and Analysis | 4/2013 |
| 2.1.7 : Verification and Validation | 1/2012 |
| 2.2 : Research for Service Analysis | 4/2013 |
| 2.2.1 : Research, Engineering, and Development Process | 4/2013 |
| 2.2.1.1 : What Must Be Done | 4/2013 |
| 2.2.1.2 : Outputs and Products | 7/2010 |
| 2.2.1.3 : Who Approves? | 4/2013 |
| 2.2.2 : Concept Maturity and Technology Development Process | 4/2013 |
| 2.2.2.1 : What Must be Done? | 4/2013 |
| 2.2.2.2 : Outputs and Products | 4/2013 |
| 2.2.2.3 : Who Does It? | 4/2013 |
| 2.2.2.4 : Who Approves? | 4/2013 |
| 2.3 : Service Analysis and Strategic Planning | 4/2013 |
| 2.3.1 : What Must Be Done | 10/2013 |
| 2.3.2 : Outputs and Products | 4/2013 |
| 2.3.2.1 : Service Analysis and Strategic Planning | 4/2013 |
| 2.3.2.2 : NAS ConOps Change Development and Decomposition | 4/2013 |
| 2.3.3 : Who Does It? | 4/2013 |
| 2.3.3.1 : Service Analysis and Strategic Planning | 10/2013 |
| 2.3.3.2 : NAS ConOps Change Development and Decomposition | 4/2013 |
| 2.3.4 : Who Approves? | 4/2013 |
| 2.3.4.1 : Service Analysis and Strategic Planning | 4/2013 |
| 2.3.4.2 : NAS ConOps Change Development and Decomposition | 4/2013 |
| 2.3.5 : Concept and Requirements Definition Readiness Decision | 4/2013 |
| 2.3.5.1 : Entrance Criteria | 4/2013 |
| 2.3.5.2 : Decision Actions | 4/2013 |
| 2.4 : Concept and Requirements Definition | 4/2013 |
| 2.4.1 : What Must Be Done | 10/2013 |
| 2.4.2 : Outputs and Products | 4/2013 |
| 2.4.3 : Who Does it? | 4/2013 |
| 2.4.4 : Who Approves? | 4/2013 |
| 2.4.5 : Investment Analysis Readiness Decision | 4/2013 |
| 2.4.5.1 : Entrance Criteria | 4/2013 |
| 2.4.5.2 : Joint Resources Council Actions | 4/2013 |
| 2.5 : Investment Analysis | 4/2013 |
| 2.5.1 : What Must Be Done | 4/2013 |
| 2.5.2 : Outputs and Products | 1/2010 |
| 2.5.2.1 : Initial Investment Analysis | 4/2013 |
| 2.5.2.2 : Final Investment Analysis | 4/2013 |
| 2.5.3 : Who Does It? | 4/2013 |
| 2.5.4 : Who Approves? | 4/2013 |
| 2.5.5 : Initial Investment Decision | 4/2013 |
| 2.5.6 : Final Investment Decision | 4/2013 |
| 2.6 : Solution Implementation | 4/2013 |
| 2.6.1 : What Must Be Done | 4/2013 |
| 2.6.2 : Outputs and Products | 4/2013 |
| 2.6.3 : Who Does It? | 10/2013 |
| 2.6.4 : Who Approves? | 4/2013 |
| 2.6.5 : In-Service Decision | 7/2013 |
| 2.6.5.1 : Entrance Criteria | 7/2013 |
| 2.6.5.2 : In-Service Decision Authority Actions | 4/2013 |
| 2.7 : In-Service Management | 4/2013 |
| 2.7.1 : What Must Be Done | 4/2013 |
| 2.7.2 : Outputs and Products | 4/2013 |
| 2.7.3 : Who Does It? | 10/2013 |
| 2.7.4 : Who Approves? | 4/2013 |
| 3 : Procurement Policy | |
| 3.1 : Overview | |
| 3.1.1 : Introduction | 7/2007 |
| 3.1.2 : Applicability | |
| 3.1.3 : Fundamental Principles | 7/2013 |
| 3.1.4 : Contracting Authority | 1/2012 |
| 3.1.5 : Conflict of Interest | 10/2008 |
| 3.1.6 : Disclosure of Information | 10/2008 |
| 3.1.7 : Organizational Conflicts of Interest | |
| 3.1.8 : Procurement Integrity Act | |
| 3.1.9 : Electronic Commerce in Contracting | 1/2014 |
| 3.2 : Contracting | |
| 3.2.1 Procurement Planning | |
| 3.2.1.1 Applicability | 4/2013 |
| 3.2.1.2 Policy | 11/2009 |
| 3.2.1.2.1 Market Analysis | 4/2013 |
| 3.2.1.2.2 Procurement Plan | 4/2013 |
| 3.2.1.2.3 Consideration of Agency Wide Contracts | 1/2014 |
| 3.2.1.2.4 Independent Government Cost Estimate | 1/2010 |
| 3.2.1.3 Guidance and Principles | 11/2009 |
| 3.2.1.3.1 Development | |
| 3.2.1.3.2 Scope of Procurement | |
| 3.2.1.3.3 Budget Allocation Release | |
| 3.2.1.3.4 Quality Assurance | |
| 3.2.1.3.5 Labor Relations | |
| 3.2.1.3.6 Maintaining Competition | |
| 3.2.1.3.7 Single-Source Approval | 11/2009 |
| 3.2.1.3.8 Pre-Release of Documents | |
| 3.2.1.3.9 Reserved | |
| 3.2.1.3.10 Reserved | |
| 3.2.1.3.11 Public Announcements | 6/2006 |
| 3.2.1.3.11.1 General | 1/2010 |
| 3.2.1.3.11.2 Procurements Involving Products from Federal Prison Industries | 7/2008 |
| 3.2.1.3.12 OMB Circular A-76, Performance of Commercial Activities. | |
| 3.2.1.4 Chief Financial Officer Requirements | 1/2011 |
| 3.2.1.4.1 Contract Line Item Structure | 1/2011 |
| 3.2.1.4.2 Chief Financial Officer Approval | 1/2011 |
| 3.2.1.5 Disaster or Emergency Preparedness and Response | 7/2007 |
| 3.2.1.5.1 Local Area Set-Asides for Disaster or Emergency | 7/2007 |
| 3.2.1.5.2 Continuity of Services-Mission Critical Contracts | 7/2007 |
| 3.2.2 Source Selection | |
| 3.2.2.1 : Applicability | |
| 3.2.2.2 : Policy | 7/2012 |
| 3.2.2.3 : Complex and Noncommercial Source Selection | |
| 3.2.2.3.1 : Selection Phases | |
| 3.2.2.3.1.1 : Planning | |
| 3.2.2.3.1.2 : Screening | |
| 3.2.2.3.1.2.1 : Screening Information Request | 7/2007 |
| 3.2.2.3.1.2.2 : Communications with Offerors | |
| 3.2.2.3.1.2.3 Receipt/Evaluation of Submittals | |
| 3.2.2.3.1.2.4 : Changes in Requirements | |
| 3.2.2.3.1.2.5 : SSO Decision | |
| 3.2.2.3.1.3 : Selection | 10/2012 |
| 3.2.2.3.1.4 : Debriefing | |
| 3.2.2.3.1.5 : Lessons Learned | |
| 3.2.2.3.2 : Reserved | |
| 3.2.2.3.2.1 : Reserved | |
| 3.2.2.3.2.2 : Reserved | |
| 3.2.2.3.2.3 : Reserved | |
| 3.2.2.3.2.4 : Reserved | |
| 3.2.2.3.2.5 : Reserved | |
| 3.2.2.3.2.6 : Reserved | |
| 3.2.2.4 : Single-Source Selection | 7/2011 |
| 3.2.2.4.1 : Single-Source Procurement Process | |
| 3.2.2.4.1.1 : Emergencies | |
| 3.2.2.4.1.2 : Non-emergencies | 10/2008 |
| 3.2.2.4.1.3 : Lessons Learned | |
| 3.2.2.5 : Commercial and Simplified Purchase Method | 6/2006 |
| 3.2.2.5.1 : Planning | |
| 3.2.2.5.2 : Sourcing Determination | |
| 3.2.2.5.3 : Screening | |
| 3.2.2.5.4 : Selection Decision and Award | |
| 3.2.2.5.4.1 : Documentation | |
| 3.2.2.5.5 : Reserved | 4/2006 |
| 3.2.2.6 : Unsolicited Proposals | |
| 3.2.2.6.1 : Policy | 10/2008 |
| 3.2.2.6.2 : Receipt and Initial Review | 10/2008 |
| 3.2.2.6.3 : Prohibitions | 10/2008 |
| 3.2.2.7 : Contractor Qualifications | |
| 3.2.2.7.1 : Applicability | |
| 3.2.2.7.2 : Contractor Responsibility | |
| 3.2.2.7.3 : Contractor Team Arrangements | |
| 3.2.2.7.4 : Suspension and Debarment | |
| 3.2.2.8 : Describing FAA Needs | |
| 3.2.2.8.1 : Applicability | |
| 3.2.2.8.2 : Policy | |
| 3.2.2.9 : Rehabilitation Act | |
| 3.2.3 : Pricing Methodology, Principles and Standards | 10/2011 |
| 3.2.3.1 : Applicability | 10/2011 |
| 3.2.3.2 : Cost or Pricing Data | 10/2011 |
| 3.2.3.3 : Pre- and Post Award Audits | 1/2012 |
| 3.2.3.4 : FAA Cost Principles | 10/2011 |
| 3.2.3.5 : Cost Accounting Standards | 10/2011 |
| 3.2.4 : Types of Contracts | |
| 3.2.4.1 : Applicability | |
| 3.2.4.2 : Policy | |
| 3.2.4.3 : Guidance and Principles | |
| 3.2.5 : Contractor Ethical Guidelines | |
| 3.2.5.1 : Applicability | |
| 3.2.5.2 : Policy | |
| 3.2.6 : Purchase Card Program | 1/2009 |
| 3.2.6.1 : Applicability | 1/2009 |
| 3.2.6.2 : Policy | 1/2009 |
| 3.3 : Contract Funding and Payment | 10/2011 |
| 3.3.1 : Contract Funding and Payment | |
| 3.3.1.1 : Applicability | |
| 3.3.1.2 : Policy | |
| 3.3.1.2.1 : Payment | |
| 3.3.1.2.2 : Prompt Payment | 4/2012 |
| 3.3.1.2.3 : Non-delivery Payments (Commercial and Noncommercial) | |
| 3.3.1.2.4 : Contract Funding | |
| 3.3.1.2.5 : Debt Collection | |
| 3.3.2 : Reserved | 10/2011 |
| 3.4 : Bonds, Insurance, and Taxes | |
| 3.4.1 : Bonds and Insurance | |
| 3.4.1.1 : Applicability | 7/2008 |
| 3.4.1.2 : Policy | 10/2010 |
| 3.4.2 : Taxes | |
| 3.4.2.1 : Applicability | |
| 3.4.2.2 : Policy | |
| 3.5 : Patents, Rights in Data and Copyrights | |
| 3.5.1 : Applicability | |
| 3.5.2 : Policy | |
| 3.6 : Socio-Economic and Other Policies and Programs | |
| 3.6.1 : Small Business Development Program | 7/2005 |
| 3.6.1.1 : Applicability | 10/2012 |
| 3.6.1.2 : Policy | 1/2010 |
| 3.6.1.3 : Principles for the Small Business Development Program | 7/2005 |
| 3.6.1.3.1 : Program Goals | 7/2005 |
| 3.6.1.3.2 : Prime Contracting with Small Businesses | |
| 3.6.1.3.3 : Set-Asides to Very Small Businesses | |
| 3.6.1.3.4 : Set-Asides to Small Businesses Owned and Controlled by Socially and Economically Disadvantaged Individuals (8(a) Certified) | 10/2012 |
| 3.6.1.3.5 : Noncompetitive Awards to SEDB (8(a)) Vendors | 10/2012 |
| 3.6.1.3.6 : Set-Asides to Service-Disabled Veteran Owned Small Businesses | 10/2008 |
| 3.6.1.3.7 : Subcontracting with Small Businesses and Small Businesses Owned and Controlled by Socially and Economically Disadvantaged Individuals | |
| 3.6.2 : Labor Laws | |
| 3.6.2.1 : Applicability | |
| 3.6.2.2 : Policy | |
| 3.6.3 : Environment, Conservation, Occupational Safety, and Drug-Free Workplace | 4/2009 |
| 3.6.3.1 : Applicability | 4/2009 |
| 3.6.3.2 : Policy | |
| 3.6.3.3 : Pollution | 7/2013 |
| 3.6.3.3.1 Non-Ozone Depleting Substances | 7/2013 |
| 3.6.3.3.2 Chemicals Management | 7/2013 |
| 3.6.3.4 : Conservation | |
| 3.6.3.4.1 : Energy Conservation and Efficiency | 7/2013 |
| 3.6.3.4.2 : Recovered or Recycled Materials | 7/2013 |
| 3.6.3.4.3 : Biobased Materials | 4/2013 |
| 3.6.3.4.4 Water Conservation and Efficiency | 7/2013 |
| 3.6.3.4.5 Delivery of Paper Documents | 7/2013 |
| 3.6.3.5 : Drug-Free Workplace | 4/2009 |
| 3.6.3.6 : Hazardous and Radioactive Materials | |
| 3.6.3.6.1 Waste Management | 7/2013 |
| 3.6.3.6.2 : Hazardous Material Identification and Material Safety Data | 4/2009 |
| 3.6.3.6.3 : Notice of Radioactive Material | 4/2009 |
| 3.6.4 : Foreign Acquisition | 10/2006 |
| 3.6.5 : Indian Incentive Program | |
| 3.6.6 : Fastener Quality Act | |
| 3.7 : Protection of Privacy and Freedom of Information | |
| 3.7.1 : Applicability | |
| 3.7.2 : Policy | |
| 3.8 : Special Categories of Contracting | |
| 3.8.1 : Agreements | |
| 3.8.1.1 : Applicability | |
| 3.8.1.2 : Use of Agreements | 1/2012 |
| 3.8.1.3 : Principles for Agreements | |
| 3.8.2 : Service Contracting | |
| 3.8.2.1 : Applicability | |
| 3.8.2.2 : Policy | |
| 3.8.2.3 : Personal Services Contracts | |
| 3.8.2.3.1 : Reserved | |
| 3.8.2.3.2 : Determination | |
| 3.8.2.4 : Performance Based Service Contracts | |
| 3.8.3 : Federal Supply Schedule Contracts | |
| 3.8.3.1 : Applicability | |
| 3.8.3.2 : Policy | |
| 3.8.4 : Required Sources of Products/Services and Use of Government Sources | |
| 3.8.4.1 : Applicability | 2/2005 |
| 3.8.4.2 : Government Sources for Products and Services | 7/2008 |
| 3.8.5 : Leases | 1/2006 |
| 3.8.5.1 : Applicability | 1/2006 |
| 3.8.5.2 : Policy | 1/2006 |
| 3.8.6 : Strategic Sourcing | 7/2007 |
| 3.8.7 : Construction Contracting | 7/2007 |
| 3.8.7.1 : Applicability | 7/2007 |
| 3.8.7.2 : Policy | 7/2007 |
| 3.9 : Resolution of Protests and Contract Disputes | |
| 3.9.1 : Applicability | |
| 3.9.2 : Policy | |
| 3.9.3 : Reserved | |
| 3.9.4 : FAA Dispute Resolution System | |
| 3.9.5 : Initial Dispute Resolution at the Contracting Officer Level | |
| 3.9.6 : Dispute Resolution at the ODRA | |
| 3.9.7 : Obligation to Continue Performance | |
| 3.9.8 : Matters Not Subject to Protest | |
| 3.9.9 : Confidentiality of the ADR Process | |
| 3.10 : Contract Administration | |
| 3.10.1 : Contract Administration | |
| 3.10.1.1 : Applicability | |
| 3.10.1.2 : Policy | |
| 3.10.2 : Subcontracting Policies | |
| 3.10.2.1 : Applicability | |
| 3.10.2.2 : Policy | |
| 3.10.3 : Reserved | 10/2012 |
| 3.10.3.1 : Applicability | |
| 3.10.3.2 : Policy | |
| 3.10.4 : Quality Assurance | |
| 3.10.4.1 : Applicability | |
| 3.10.4.2 : Policy | 10/2011 |
| 3.10.5 : Product Improvement/Technology Enhancement | |
| 3.10.5.1 : Applicability | |
| 3.10.5.2 : Policy | |
| 3.10.6 : Termination of Contracts | |
| 3.10.6.1 : Applicability | |
| 3.10.6.2 : Policy | |
| 3.10.7 : Extraordinary Contractual Actions | |
| 3.10.7.1 : Applicability | |
| 3.10.7.2 : Policy | |
| 3.10.8 : First Article Approval and Testing | |
| 3.10.9 : Closeout of Completed Contracts | |
| 3.11 : Transportation | |
| 3.11.1 : Applicability | |
| 3.11.2 : Policy | |
| 3.12 : Reserved | |
| 3.13 : Other Administrative Matters | |
| 3.13.1 : Applicability | |
| 3.13.1.1 : Plain Language | 7/2006 |
| 3.13.2 : Policy | |
| 3.13.2.1 : AMS Contract Clauses and Provisions | 4/2011 |
| 3.13.2.2 : Reserved | |
| 3.13.2.2.1 : Reserved | |
| 3.13.2.2.2 : Reserved | |
| 3.13.3 : Reserved 7/2013 | |
| 3.13.4 : Contract Data Reporting | |
| 3.13.5 : Congressional Notification of Contract Awards | |
| 3.13.6 : Seat Belt Use by Contractor Employees | |
| 3.14 : Security | |
| 3.14.1 : Applicability | |
| 3.14.2 : Policy | |
| 3.14.2.1 : Contractor Personnel Security Program | 7/2007 |
| 3.14.2.1.1 : Employment Suitability | 10/2007 |
| 3.14.3 : Classified Information | 7/2007 |
| 3.14.4 : Sensitive Unclassified Information | |
| 3.14.5 : Facility Security Program | |
| 3.14.6 : Information and System Security | |
| 4 : Policy for Critical Lifecycle Management Functions and Disciplines | 1/2012 |
| 4.1 : Configuration Management | |
| 4.1.1 : Scope | 1/2008 |
| 4.1.1.1 : Configuration Identification | |
| 4.1.1.2 : Configuration Status Accounting | |
| 4.1.1.3 : Configuration Control Boards | |
| 4.1.1.4 : Commercial Off-The-Shelf, Non-Developmental Items, and Commercially Available Software | |
| 4.1.2 : Application | 1/2008 |
| 4.1.3 : Structure and Responsibilities | 11/2009 |
| 4.1.4 : Activities | 11/2009 |
| 4.1.5 : Commercial Off-The-Shelf, Non-Developmental Items, and Commercially Available Software | 1/2008 |
| 4.1.6 : Local Changes | 1/2008 |
| 4.1.7 : Operational Configuration Management Policy | 1/2008 |
| 4.1.8 : Non-NAS IT CM for Enterprise Data Centers and Other IT Facilities | 1/2008 |
| 4.2 : Real Property | |
| 4.2.1 : Applicability | 1/2008 |
| 4.2.2 : Guiding Principles | 1/2012 |
| 4.2.2.1 : Contracting Authority | 1/2008 |
| 4.2.2.2 : Real Property Definition | 10/2008 |
| 4.2.3 : Policy | 1/2008 |
| 4.2.3.1 : Legal Coordination of Real Property Actions | 1/2010 |
| 4.2.3.2 : Request | 1/2008 |
| 4.2.3.3 : Requirements | 1/2012 |
| 4.2.3.3.1 : Succeeding Leases/Renewal Leases | 7/2012 |
| 4.2.3.3.1.1 : Timing of renewal/succeeding lease efforts | 1/2008 |
| 4.2.3.3.1.2 : Emergency Reservation of Expiring Funds for Continued FAA Occupancy | 1/2008 |
| 4.2.3.3.2 : Other Requirements to consider | 1/2008 |
| 4.2.3.3.2.1 : Administrative Space Order 4665.4 and GSA-Controlled Space Request | 1/2011 |
| 4.2.3.3.2.1.1 : General Services Administrative (GSA) Space Request | 1/2011 |
| 4.2.3.3.2.2 : No-Cost Land on Airport Memorandum of Agreement | 1/2008 |
| 4.2.3.3.2.3 : Rural Development Act Requirements | 1/2008 |
| 4.2.3.3.2.4 : Security | 1/2008 |
| 4.2.3.3.2.5 : Seismic Safety | 10/2012 |
| 4.2.3.3.2.6 : Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (49 CFR Part 24) | 1/2008 |
| 4.2.3.3.2.7 : Vehicle Policy | 1/2008 |
| 4.2.3.3.2.8 : Environmental / Sustainability / Energy Considerations | 1/2013 |
| 4.2.3.3.3 : Corporate Real Estate (CRE) Review and Approval | 1/2013 |
| 4.2.3.4 : Procurement Method | 1/2012 |
| 4.2.3.5 : Solicitation for Offers | 1/2012 |
| 4.2.3.5.1 : Market Survey/Advertisement/Appraisal | 1/2008 |
| 4.2.3.6 : Evaluation of Offer(s) | 1/2008 |
| 4.2.3.6.1 : Negotiation | 1/2008 |
| 4.2.3.6.2 : Communication | 1/2008 |
| 4.2.3.7 : Utilities | 4/2012 |
| 4.2.3.8 : Condemnation | 1/2008 |
| 4.2.3.9 : Award | 4/2008 |
| 4.2.3.9.1 : Terms of Leases | 4/2009 |
| 4.2.3.10 : Alterations and Improvements | 10/2012 |
| 4.2.3.11 : Inspection and Acceptance | 1/2008 |
| 4.2.3.12 : Disposal of Real Property | 1/2008 |
| 4.2.3.13 : Documentation | 1/2008 |
| 4.2.3.13.1 Accountability | 1/2008 |
| 4.2.3.13.2 : REMS | 1/2010 |
| 4.2.3.14 : Miscellaneous Provisions | 1/2008 |
| 4.2.3.14.1 Disclosure of Information | 1/2008 |
| 4.2.3.14.2 : Procurement Integrity Act | 1/2008 |
| 4.2.3.14.3 : Organizational Conflicts of Interest | 1/2008 |
| 4.2.3.14.4 : Conflict of Interest | 1/2008 |
| 4.2.3.14.5 Electronic Commerce in Contracting | 1/2008 |
| 4.2.3.14.6 : Disaster or Emergency Preparedness and Response | 8/2009 |
| 4.2.3.15 : Conveyance | 1/2012 |
| 4.2.4 : Housing Policy | 10/2011 |
| 4.2.5 : Real Estate Certification and Warrant Requirements | 7/2013 |
| 4.3 : Integrated Logistics Support | |
| 4.3.1 : Principles | 4/2013 |
| 4.3.2 : Standard Elements of Integrated Logistics Support | 10/2007 |
| 4.3.3 : Logistics Management During the AMS Lifecycle | 10/2007 |
| 4.3.3.1 : Service Analysis | 10/2007 |
| 4.3.3.2 : Concept and Requirements Definition | 4/2013 |
| 4.3.3.3 : Investment Analysis | 11/2009 |
| 4.3.3.4 : Solution Implementation | 10/2007 |
| 4.3.3.5 : In-Service Management | 10/2007 |
| 4.3.4 : Who Does It? | 10/2007 |
| 4.4 : Test and Evaluation | 11/2009 |
| 4.4.1 : Service Analysis, Concept and Requirements Definition, and Investment Analysis | 4/2013 |
| 4.4.2 : Solution Implementation | 1/2012 |
| 4.4.3 : In-Service Management | 11/2009 |
| 4.5 : Independent Operational Assessment | 10/2012 |
| 4.6 : Deployment Planning | 4/2009 |
| 4.7 : Human Factors | |
| 4.8 : Environmental, Occupational Safety and Health, and Energy Considerations | 1/2013 |
| 4.9 : Information Technology | |
| 4.10 : System Engineering | |
| 4.11 : Security | 1/2014 |
| 4.12 : National Airspace System Safety Management System | 1/2012 |
| 4.13 : Risk Management | 11/2009 |
| 4.14 : Data Standardization and Management | 7/2008 |
| 4.15 : Post Implementation Review and Operational Analysis | 11/2009 |
| 4.15.1 : Post-Implementation Review | 1/2013 |
| 4.15.2 : Operational Analysis | 11/2009 |
| 4.16 : Earned Value Management | 10/2005 |
| 4.16.1 : Program Requirements | 11/2009 |
| 4.16.2 : Contract Requirements | 11/2009 |
| 4.16.3 : EVMS Certification Requirements | 10/2013 |
| 5 : Acquisition Career Program | 10/2013 |
| Appendices | |
| Appendices | |
| Appendix A: Roles and Responsibilities | 1/2014 |
| Appendix B: Acquisition Planning and Control Documents | 10/2012 |
| Acquisition Program Baseline | 10/2012 |
| Program Requirements Document | 10/2012 |
| Business Case | 10/2012 |
| Implementation Strategy and Planning Document | 4/2013 |
| Appendix C: Definitions | 4/2013 |
| Appendix D: Acronyms | 1/2012 |
| Appendix E: External Authorities | |
| Appendix E: Part I - Statutes | 4/2013 |
| Appendix E: Part II - Executive Orders | 7/2012 |
| Appendix E: Part III - Regulations/Standards | 10/2012 |